Army: Completing the work of constructing a replacement bridge for the Tirfalsiyeh Bridge
Fady Mahouly
22:07 · 20 April 2026
1 min read
The Lebanese Army announced, through its account on the “X” platform, that it “has completed the work of constructing an alternative bridge for the Tirefalsieh-Tyre Bridge in cooperation with the Ministry of Public Works and Transport and the National Authority for the Litani River, and it has become passable to vehicles.”
← Previous article
Health emergency: 6 wounded in the raid on Qaqaiyat al-Jisr - Nabatieh District